Import
We read the entity, site and energy source written in the file and propose them row by row. Sources that do not exist yet are created when you commit.
Missing entities, sites and sources are created when you commit. The screen tells you how many before you press it.
No site chosen, no energy source chosen, a unit that source cannot use, a month we could not read, an annual figure. Nothing is skipped quietly.
A row that just says “gas” could be city gas or LNG. Picking one for you would calculate quietly with the wrong factor. You choose that row once.
Screenshots of the product as it runs. Not mockups.
Rows read from the file laid out with entity, site, source, energy source, unit and monthly usage. The same grid as the activity table, so what you see here becomes the row.
Entity, site and source stay pinned on the left while usage runs January to December on the right. The emissions cell opens the twelve months behind it.
Activity data
Enter usage in a table, get emissions
Entities, sites, sources and monthly usage in one table. Scope 1 and 2 emissions come straight from what you enter.
Activity dataMy factors
Keep only the factors this calculation needs
Keep the factors you picked in your workspace. We do not copy the value, so when the source is revised your list follows.
My factorsFind factors
Public-source emission factors, values included
Factors from sources that allow redistribution, EPD Korea, US EPA, the Korean Ministry of Environment and others, with their values. Editions of the same product sit side by side.
Find factorsCharts
See how the numbers moved
Build several dashboards and put small charts on each. Split by site, by source, by month.
ChartsChat
Ask, and the evidence comes with the answer
Type a material name or a usage figure and we find candidates in public sources. Attach a spreadsheet, PDF or image and we build the import draft.
Chat